Monday, October 20, 2008

Putting it back together...


We're to the point where the demolition and the ugly drain plumbing move is complete. We spent most of the weekend putting the floor back together. The picture above is the framing for the new shower. Contractors are coming on Wednesday to install the shower pan and backing material for the tile, so the plumbing rough-in has to be complete by then. I think we'll make it, and have a plan B in case something gets fouled up with the supply piping.

After that, it's a matter of peeling the rest of the wallpaper, painting, installing the floor, patching wallboard, installing the vanity, connecting the plumbing, replacing the toilet, and tiling the shower.

No sweat.

No comments: